Kanca tipidagi o'q otish moslamasini o'rnatish va sinov mashinasi uchun ehtiyot choralari

2021-06-03

Theilgak tipidagi portlatish mashinasiodatda katta ko'rinishga ega va o'rnatish jarayoni kichik uskunalarga qaraganda ancha murakkab. To'g'ri o'rnatish va sinov mashinasi keyingi uskunaning normal ishlashini ta'minlashning kalitidir. Malakasiz boshlang'ich operatsiyalar bo'lsa, foydalanuvchilar tegishli xodimlarning ko'rsatmalariga qat'iy rioya qilishlari yoki ko'rsatmalarga murojaat qilishlari shart. Ruxsat berilmagan operatsiya osongina tuzatib bo'lmaydigan zarar etkazishi mumkinilgakli portlatish mashinasi. Theshot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Theilgak tipidagi portlatish mashinasi is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Theprecautions for the installation and debugging of the relevant components are introduced below.
1. O'q otish moslamasi:
Theshot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Yuk ko'taruvchi va vintli konveyer:
Avval yuk ko'taruvchi paqir va spiral pichoqlar to'g'ri yo'nalishda ishlayotganini tekshirish uchun yuklamaslik testini o'tkazing, so'ng burilishning oldini olish uchun yuk ko'targich kamarini mo''tadil taranglik bilan mahkamlang, so'ng tekshirish uchun yuk sinovini o'tkazing. shovqin va tebranishning g'aroyibligi bor -yo'qligini tekshiring va to'siqlarni olib tashlang.
3. Qum-qumni ajratuvchi:
Avval qo'chqor harakatining egiluvchanligini tekshiring, so'ngra ajratuvchi plastinkaning to'g'ri holatini tekshiring, keyin yuk ko'taruvchi va disk raskadrovka paytida po'latdan o'q uzilishi doimiy ravishda kuzatiladi va po'lat o'qlarning chiqib ketayotganini va tushayotganligini tekshirib ko'ring. truba bo'shatilganda